In your community

header_works.jpg

Ringwood North sewerage backlog program

Ringwood North is on the edge of Melbourne's suburban fringe, close to semi-rural areas and the Yarra River Valley. Ringwood North has properties in several backlog areas. All the areas that are planned for design and construction in the near future are close to the Park Orchards suburb boundary.
 

Ringwood North Backlog Areas:

 

Williams Road area

Sewerage is now available in the Williams Road area in Park Orchards. This area includes seven properties located in Ringwood North.

Connection to the new sewerage system is required to ensure the benefits of the system are fully realised by your local environment and community.

To see if your property is within this backlog area, see map of properties in this area (PDF, 3348KB).

Download fact sheet for properties in this area: Nature Calls – Park Orchards (Williams Rd) (PDF, 833KB)

Download general fact sheet: Connecting to the sewerage system when it becomes available (PDF, 238KB).
 

Hall Road and Wellesley Road area (RA0039)

This area is part of the Backlog Sewerage Program area RA0039, and is planned to be serviced by sewer over a two or three year period commencing in the financial year 2013/14 and finishing 2015/16. Most of this area is contained within Park Orchards, but several dozen properties in the area of Ringwood North bound by Warrandyte-Ringwood Road, Croydon Road, the North Ringwood/Warranwood boundary and Old Warrandyte Road are also included in this area. This area also includes some properties from Warrandyte South.

To see if your property is within this backlog area, see map of properties in this area (PDF, 2739KB).

Currently work has not commenced on designing sewer for this reticulation area.
 

Wilkinson Way area (RA0017)

Several properties on Wilkinson Way, Athelstane Road, Cormistom Road and Warrandyte Road are scheduled to be serviced in the 2012/2013 financial year.

The detailed design for the pressurised sewer system in this area is near completion. Yarra Valley Water will continue to ensure the community is informed of our work on developing their sewerage service.

To see if your property is within this backlog area (RA0017), see map of properties in this area (PDF, 3090KB).